Skip to content

The fork

Buy raw. Toll it. Sell the product.

This planning workspace models three separate bilateral contracts. The principals execute them and appoint regulated payment and title providers; Critical.Minerals does not arrange, fund or settle them.

Bulletin board

Open bilateral contact

Two principals choose whether to discuss a non-binding indication. Markets.

Build

Three-way structure

Offtake, origin and mill contracts remain separate legal instruments. Provider events shown here are planning evidence, not payment or title instructions.

01 Buy raw

VEIN-C 99.5

State minerals seller · Colombo

Qty
20.000 t
Price
2,850 USD/t
Notional
$57,000
Instrument
Independent provider

Clean eBL + SGS assay + dual-use check

02 Refine

Exfoliation to 2–5 layer FLG ink

Toll mill · Kwinana

Qty
Campaign · 20 t in / 4 t out
Price
22,000 USD lump
Notional
$22,000
Instrument
Independent provider

Inbound weight + COA against ink spec

03 Pre-order sale

FLG-INK 2–5 layer

Conductive-inks OEM · Manchester

Qty
4.000 t
Price
38,800 USD/t
Notional
$155,200
Instrument
SBLC

COA + packing list + dual control. Surplus to builder.

Waterfall

20.000 t vein graphite (20% solids) → 4.000 t few-layer graphene ink. Not 20 t of graphene.

Offtake in (UK pre-order)$155,200
Origin out (Colombo FOB)$57,000
Freight and insurance$8,600
Toll mill (Kwinana)$22,000
Illustrative fixed software fees$6,240
Surplus to builder$61,360
01Draft
02Offtake live
03Funded
04Origin paid
05In process
06Settled
No structure yetColombo → Kwinana → Manchester

Graphite → FLG ink

Identity is open. The structure can be drafted. It cannot be funded. Members

Structure workflows require an authenticated server workflow; no local mutation is available.

Who takes the risk

  • The member is principal on all three legs. Inventory, yield and spec sit with them.
  • The platform never owns the graphite or the ink. Fixed software fees only.
  • If the mill misses spec, offtake does not take. Origin may already have been paid — that hole is the builder’s, unless a processor SBLC was written in.
  • Yield is disclosed: 20 t in does not mean 20 t of graphene out.

Illustrative structure. Marks and yields are a preview. Not an offtake, not a securities offer, not a promise that a Sri Lankan state seller or a UK OEM is on this book.